On the part inventory model sequencing problem: complexity and beam search heuristic
From MaRDI portal
Publication:633549
DOI10.1007/s10951-010-0214-9zbMath1208.90004OpenAlexW2035595752MaRDI QIDQ633549
Armin Scholl, Nils Boysen, Malte Fliedner
Publication date: 1 April 2011
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://www.db-thueringen.de/receive/dbt_mods_00016227
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Inventory, storage, reservoirs (90B05)
Cites Work
- Unnamed Item
- Sequencing mixed-model assembly lines to minimize part inventory cost
- Sequencing mixed-model assembly lines: survey, classification and model critique
- Beam-ACO--hybridizing ant colony optimization with beam search: an application to open shop scheduling
- Minimizing variation of production rates in just-in-time systems: A survey
- Backtracking and exchange of information: Methods to enhance a beam search algorithm for assembly line scheduling
- Solving real car sequencing problems with ant colony optimization
- Level scheduling of mixed-model assembly lines under storage constraints
- Mixed-Model Sequencing to Minimize Utility Work and the Risk of Conveyor Stoppage
This page was built for publication: On the part inventory model sequencing problem: complexity and beam search heuristic