A faster exact method for solving the robust multi-mode resource-constrained project scheduling problem
From MaRDI portal
Publication:6393614
DOI10.1016/J.ORL.2022.08.003zbMath1525.90187arXiv2203.06983MaRDI QIDQ6393614
Publication date: 14 March 2022
Integer programming (90C10) Mixed integer programming (90C11) Deterministic scheduling theory in operations research (90B35)
This page was built for publication: A faster exact method for solving the robust multi-mode resource-constrained project scheduling problem