Dismantling of nuclear power plants at optimal NPV
From MaRDI portal
Publication:646667
DOI10.1007/s10479-010-0788-9zbMath1225.90051OpenAlexW2005955828MaRDI QIDQ646667
Jürgen Zimmermann, Jan-Hendrik Bartels, Thorsten Gather
Publication date: 17 November 2011
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-010-0788-9
resource-constrained project schedulingdismantling of nuclear power plantsmultiple execution modesnet-present-value optimization
Related Items (2)
An updated survey of variants and extensions of the resource-constrained project scheduling problem ⋮ Time symmetry of resource constrained project scheduling with general temporal constraints and take-give resources
Uses Software
Cites Work
- A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations
- Project scheduling. A research handbook.
- Project scheduling with inventory constraints
- Project Scheduling Under Partially Renewable Resource Constraints
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
This page was built for publication: Dismantling of nuclear power plants at optimal NPV