Dismantling of nuclear power plants at optimal NPV

From MaRDI portal
Publication:646667
Jump to:navigation, search

DOI10.1007/s10479-010-0788-9zbMath1225.90051OpenAlexW2005955828MaRDI QIDQ646667

Jürgen Zimmermann, Jan-Hendrik Bartels, Thorsten Gather

Publication date: 17 November 2011

Published in: Annals of Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1007/s10479-010-0788-9


zbMATH Keywords

resource-constrained project schedulingdismantling of nuclear power plantsmultiple execution modesnet-present-value optimization


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35)


Related Items (2)

An updated survey of variants and extensions of the resource-constrained project scheduling problem ⋮ Time symmetry of resource constrained project scheduling with general temporal constraints and take-give resources


Uses Software

  • PSPLIB


Cites Work

  • A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations
  • Project scheduling. A research handbook.
  • Project scheduling with inventory constraints
  • Project Scheduling Under Partially Renewable Resource Constraints
  • Unnamed Item
  • Unnamed Item
  • Unnamed Item
  • Unnamed Item


This page was built for publication: Dismantling of nuclear power plants at optimal NPV

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:646667&oldid=12550186"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 30 January 2024, at 09:49.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki