A dynamic programming approach for batch sizing in a multi-stage production process with random yields
From MaRDI portal
Publication:648335
DOI10.1016/j.amc.2011.06.022zbMath1233.90142OpenAlexW2080795568MaRDI QIDQ648335
Abdullah Konak, Michael R. Bartolacci, Bezalel Gavish
Publication date: 22 November 2011
Published in: Applied Mathematics and Computation (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.amc.2011.06.022
Related Items (2)
A disruption recovery plan in a three-stage production-inventory system ⋮ The multi-stage multi-product batch-sizing problem in the steel industry
Cites Work
- Production Control in Multistage Systems with Variable Yield Losses
- Part Dispatch in Random Yield Multistage Flexible Test Systems for Printed Circuit Boards
- Multi-Echelon Production Scheduling When Demand is Stochastic
- A Hybrid Algorithm for Simultaneous Scheduling of Production and Distribution in Multi-Echelon Structures
- Lot Sizing with Random Yields: A Review
This page was built for publication: A dynamic programming approach for batch sizing in a multi-stage production process with random yields