Scheduling double-track gantry cranes to minimize the overall loading/unloading time
From MaRDI portal
Publication:6542999
DOI10.1142/s0217595923400213zbMath1540.9011MaRDI QIDQ6542999
An Zhang, Jie Wang, Yong Chen, Xinle Xuan, Guangting Chen, Yuehuan Wang, Hecheng Zhang
Publication date: 23 May 2024
Published in: Asia-Pacific Journal of Operational Research (Search for Journal in Brave)
computational experimentsapproximation algorithmworst case analysisMILP modelnon-crossing constraintgantry cranes
Mixed integer programming (90C11) Linear programming (90C05) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Inventory, storage, reservoirs (90B05)
This page was built for publication: Scheduling double-track gantry cranes to minimize the overall loading/unloading time