Shipment lead time hedging and coordination in prefabricated construction supply chain
From MaRDI portal
Publication:6550855
DOI10.1051/ro/2024041zbMATH Open1541.90029MaRDI QIDQ6550855
Zhenyi Wang, Shibin Zhang, Haizi Wang, Shuai Qiu
Publication date: 5 June 2024
Published in: RAIRO. Operations Research (Search for Journal in Brave)
supply chain managementsupply chain coordinationdelivery performanceprefabricated constructionshipment lead time hedging
Transportation, logistics and supply chain management (90B06) Inventory, storage, reservoirs (90B05)
Cites Work
- Project-driven supply chains: integrating safety-stock and crashing decisions for recurrent projects
- Lead-time hedging and coordination between manufacturing and sales departments using Nash and Stackelberg games
- Supply chain coordination with downstream operating costs: coordination and investment to improve downstream operating efficiency
- Coordination mechanisms of supply chain systems
- Managerial and economic impacts of reducing delivery variance in the supply chain
- Side-payment contracts in two-person nonzero-sum supply chain games: review, discussion and applications
- Coordinating supply chains with stochastic demand by crashing lead times
- Reducing the cost of untimely supply chain delivery performance for asymmetric Laplace distributed delivery
- Lead-time quotation and hedging coordination in make-to-order supply chain
- Impact of uncertain demand and lead-time reduction on two-echelon supply chain
- Note—Effects of Centralization on Expected Costs in a Multi-Location Newsboy Problem
- The Multi-Item Setup-Reduction Investment-Allocation Problem with Continuous Investment-Cost Functions
- Transshipment and coordination in a two-echelon supply chain
- Production rate and lot-size dependent lead time reduction strategies in a supply chain model with stochastic demand, controllable setup cost and trade-credit financing
- Customer-Order Information, Leadtimes, and Inventories
This page was built for publication: Shipment lead time hedging and coordination in prefabricated construction supply chain