The berth allocation and quay crane assignment problem with crane travel and setup times
From MaRDI portal
Publication:6551060
DOI10.1016/J.COR.2023.106468MaRDI QIDQ6551060
Juan Francisco Correcher, R. Alvarez-Valdes, Federico Perea
Publication date: 6 June 2024
Published in: Computers \& Operations Research (Search for Journal in Brave)
Could not fetch data.
Could not fetch data.
Cites Work
- A follow-up survey of berth allocation and quay crane scheduling problems in container terminals
- Optimal berth allocation, time-variant quay crane assignment and scheduling with crane setups in container terminals
- A survey of berth allocation and quay crane scheduling problems in container terminals
- MIP approaches for the integrated berth allocation and quay crane assignment and scheduling problem
- New exact methods for the time-invariant berth allocation and quay crane assignment problem
- Robust scheduling for berth allocation and quay crane assignment problem
- An evolutionary approach to a combined mixed integer programming model of seaside operations as arise in container ports
- A scheduling method for Berth and Quay cranes
- Simultaneous berth allocation and yard planning at tactical level
- The berth allocation problem in terminals with irregular layouts
- Optimal berth allocation and time-invariant quay crane assignment in container terminals
- Exact and heuristic methods for the integrated berth allocation and specific time-invariant quay crane assignment problems
This page was built for publication: The berth allocation and quay crane assignment problem with crane travel and setup times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6551060)