Planning container inspection and repair: a case study
From MaRDI portal
Publication:6551167
DOI10.1016/j.cor.2024.106555MaRDI QIDQ6551167
Erwin Pesch, Mikhail N. Lukashevich, Mikhail Y. Kovalyov, Katarzyna A. Kuzmicz
Publication date: 6 June 2024
Published in: Computers \& Operations Research (Search for Journal in Brave)
Cites Work
- Unnamed Item
- Reverse logistics and closed-loop supply chain: a comprehensive review to explore the future
- Quantitative models for reverse logistics: A review
- The green capacitated multi-item lot sizing problem with parallel machines
- Effective matheuristics for the multi-item capacitated lot-sizing problem with remanufacturing
- Comparing sequential and integrated approaches for the production routing problem
- Rounding heuristics for multiple product dynamic lot-sizing in the presence of queueing behavior
- Multi-item uncapacitated lot sizing problem with inventory bounds
- A single-item economic lot-sizing problem with a non-uniform resource: Approximation
- Dynamic Version of the Economic Lot Size Model
- A Multi-Product Dynamic Lot-Size Model with Individual and Joint Set-up Costs
- Network design for reverse and closed‐loop supply chains: An annotated bibliography of models and solution approaches
- Cost minimizing planning of container inspection and repair in multiple facilities
This page was built for publication: Planning container inspection and repair: a case study