Robust design of ARMA and ACC charts for imperfect and autocorrelated processes under uncertainty
From MaRDI portal
Publication:6564301
DOI10.1080/00949655.2023.2273370MaRDI QIDQ6564301
R. Tavakkoli-Moghaddam, Mohammad Saber Fallah Nezhad, Samrad Jafarian-Namin, Ali Salmasnia
Publication date: 1 July 2024
Published in: Journal of Statistical Computation and Simulation (Search for Journal in Brave)
Cites Work
- Title not available (Why is that?)
- Robust optimization of an imperfect process when the mean and variance are jointly monitored under dependent multiple assignable causes
- The robust economic statistical design of the Hotelling'sT2chart
- A Robust Control Chart for Monitoring the Mean of an Autocorrelated Process
- Theory and Applications of Robust Optimization
- An integrated quality, maintenance and production model based on the delayed monitoring under the ARMA control chart
- The Price of Robustness
- Economic-statistical design of adaptive arma control chart for autocorrelated data
- Robust residual control chart for contaminated time series: A solution to the effects of outlier-driven parameter misestimation on the control chart performance
- A new sampling strategy to reduce the effect of autocorrelation on a control chart
- A comparison study of effectiveness and robustness of robust economic designs ofT2chart using genetic algorithm
- A combined mixed-s-skip sampling strategy to reduce the effect of autocorrelation on the X̄ scheme with and without measurement errors
This page was built for publication: Robust design of ARMA and ACC charts for imperfect and autocorrelated processes under uncertainty
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6564301)