Analysis of the impact of corrective actions for stochastic project networks
From MaRDI portal
Publication:6565390
DOI10.1016/j.ejor.2024.02.040MaRDI QIDQ6565390
Mario Vanhoucke, Forough Vaseghi, Annelies Martens
Publication date: 2 July 2024
Published in: European Journal of Operational Research (Search for Journal in Brave)
Cites Work
- Unnamed Item
- Experimental investigation of heuristics for resource-constrained project scheduling: an update
- A survey of variants and extensions of the resource-constrained project scheduling problem
- On the use of the complexity index as a measure of complexity in activity networks
- On criticality and sensitivity in activity networks
- Computing project makespan distributions: Markovian PERT networks revisited
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Using schedule risk analysis with resource constraints for project control
- The impact of a limited budget on the corrective action taking process
- Rangen: A random network generator for activity-on-the-node networks
- Developing activity duration specification limits for effective project control
- Computing the probability distribution of project duration in a PERT network
- Bounding the Project Completion Time Distribution in PERT Networks
- Optimal Reduction of Two-Terminal Directed Acyclic Graphs
- Bounding distributions for a stochastic pert network
- On the minimum dummy-arc problem
- A simulated annealing algorithm for resource constrained project scheduling problems
- A Model-Based Framework to Overlap Product Development Activities
- Functional estimation of activity criticality indices and sensitivity analysis of expected project completion time
- Markov and Markov-Regenerative <scp>pert</scp> Networks
- A hierarchical approach for bounding the completion time distribution of stochastic task graphs
- Application of a Technique for Research and Development Program Evaluation
- An Experimental Investigation and Comparative Evaluation of Production Line Balancing Techniques
- Bounding Distributions for a Stochastic Acyclic Network
- The exact overall time distribution of a project with uncertain task durations
- A computational study on bounding the makespan distribution in stochastic project networks
This page was built for publication: Analysis of the impact of corrective actions for stochastic project networks