An evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lags

From MaRDI portal
Publication:657259

DOI10.1007/s10951-009-0125-9zbMath1230.90085OpenAlexW2083823805MaRDI QIDQ657259

Agustín Barrios, Vicente Valls, Francisco Ballestín

Publication date: 16 January 2012

Published in: Journal of Scheduling (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1007/s10951-009-0125-9




Related Items (6)



Cites Work


This page was built for publication: An evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lags