Solving scheduling problems from high-level models
From MaRDI portal
Publication:657573
DOI10.1007/S10288-010-0143-7zbMath1230.90096OpenAlexW1979928555MaRDI QIDQ657573
Publication date: 10 January 2012
Published in: 4OR (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10288-010-0143-7
Uses Software
Cites Work
- Resource-constrained project scheduling: A critical activity reordering heuristic
- A very fast TS/SA algorithm for the job shop scheduling problem
- Lagrangian bounds for just-in-time job-shop scheduling
- A genetic local search algorithm for minimizing total weighted tardiness in the job-shop scheduling problem
- A fast tabu search algorithm for the group shop scheduling problem
- Parallel Local Search in Comet
- A Position-Based Propagator for the Open-Shop Problem
This page was built for publication: Solving scheduling problems from high-level models