Controlling the exponentially weighted moving average \(S^2\) control chart false alarm behavior when the in-control variance level must be estimated
From MaRDI portal
Publication:6579667
DOI10.1002/asmb.2613MaRDI QIDQ6579667
Publication date: 25 July 2024
Published in: Applied Stochastic Models in Business and Industry (Search for Journal in Brave)
Cites Work
- Unnamed Item
- Unnamed Item
- Estimation in Shewhart control charts: effects and corrections.
- An EWMA chart for monitoring the process standard deviation when parameters are estimated
- Practical aspects of false alarm control for change point detection: beyond average run length
- On ARL-Unbiased Control Charts
- Guaranteed Conditional Performance of Control Charts via Bootstrap Methods
- Is Average Run Length to False Alarm Always an Informative Criterion?
- Combined Shewhart–EWMA control charts with estimated parameters
- Bounds for the Distribution of the Run Length of Geometric Moving Average Charts
- Some Omnibus Exponentially Weighted Moving Average Statistical Process Monitoring Schemes
- Are estimated control charts in control?
- Control Charting Normal Variance – Reflections, Curiosities, and Recommendations
- Optimal designs of one-sided ewma charts for monitoring a process variance
- Computation of the run-length percentiles of CUSUM control charts under changes in variances
- Accurate ARL Calculation for EWMA Control Charts Monitoring Normal Mean and Variance Simultaneously
This page was built for publication: Controlling the exponentially weighted moving average \(S^2\) control chart false alarm behavior when the in-control variance level must be estimated