Exact and heuristic methods for Anchor-Robust and Adjustable-Robust RCPSP
From MaRDI portal
Publication:6581390
DOI10.1007/s10479-023-05537-6MaRDI QIDQ6581390
Luca Brunod-Indrigo, Pascale Bendotti, Adèle Pass-Lanneau
Publication date: 30 July 2024
Published in: Annals of Operations Research (Search for Journal in Brave)
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Robustness in mathematical programming (90C17)
Cites Work
- Models and algorithms for robust PERT scheduling with time-dependent tast durations
- Insertion techniques for static and dynamic resource-constrained project scheduling.
- Adjustable robust solutions of uncertain linear programs
- A computational study of exact approaches for the adjustable robust resource-constrained project scheduling problem
- Anchored reactive and proactive solutions to the CPM-scheduling problem
- Project scheduling under uncertainty: survey and research potentials
- The construction of stable project baseline schedules
- Anchored rescheduling problems under generalized precedence constraints
- Solving two-stage robust optimization problems using a column-and-constraint generation method
- A compact reformulation of the two-stage robust resource-constrained project scheduling problem
- The Price of Robustness
- Technical Note—Convex Programming with Set-Inclusive Constraints and Applications to Inexact Linear Programming
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- The Anchor-Robust Project Scheduling Problem
This page was built for publication: Exact and heuristic methods for Anchor-Robust and Adjustable-Robust RCPSP