Simulated annealing for centralised resource-constrained multiproject scheduling to minimise the maximal cash flow gap under different payment patterns
From MaRDI portal
Publication:6588469
DOI10.1007/s10479-023-05580-3zbMath1545.90067MaRDI QIDQ6588469
Tao Jia, Yukang He, Weibo Zheng
Publication date: 15 August 2024
Published in: Annals of Operations Research (Search for Journal in Brave)
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
This page was built for publication: Simulated annealing for centralised resource-constrained multiproject scheduling to minimise the maximal cash flow gap under different payment patterns