Software project scheduling under activity duration uncertainty
From MaRDI portal
Publication:6588492
DOI10.1007/s10479-023-05343-0zbMATH Open1545.9009MaRDI QIDQ6588492
Hanyu Zhu, Linwen Zheng, Hongbo Li, Fang Xie
Publication date: 15 August 2024
Published in: Annals of Operations Research (Search for Journal in Brave)
Stochastic programming (90C15) Approximation methods and heuristics in mathematical programming (90C59) Stochastic scheduling theory in operations research (90B36) Theory of organizations, manpower planning in operations research (90B70)
Cites Work
- Unnamed Item
- Workforce planning incorporating skills: state of the art
- Models and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendars
- Solving software project scheduling problems with ant colony optimization
- Project scheduling with flexible resources: formulation and inequalities
- Competence-based estimation of activity duration in IT projects
- On the strength of time-indexed formulations for the resource-constrained project scheduling problem
- A new algorithm for resource-constrained project scheduling with breadth and depth of skills
- Scheduling projects with multi-skilled personnel by a hybrid MILP/CP Benders decomposition algorithm
- Scheduling and staffing multiple projects with a multi-skilled workforce
- A resource type analysis of the integrated project scheduling and personnel staffing problem
- Confidence level solutions for stochastic programming
- Rangen: A random network generator for activity-on-the-node networks
- Impacts of synergies on software project scheduling
- An efficient metaheuristic for integrated scheduling and staffing IT projects based on a generalized minimum cost flow network
- Finding Minimum-Cost Circulations by Successive Approximation
- Work Package Sizing and Project Performance
- Uncertainty modelling in software development projects (With case study)
- Genetic algorithms for project management
- Modeling frameworks for the multi‐skill resource‐constrained project scheduling problem: a theoretical and empirical comparison
- Resource leveling in projects with flexible structures
- A classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problem
This page was built for publication: Software project scheduling under activity duration uncertainty