Comparison of lot streaming division methodologies for multi-objective hybrid flowshop scheduling problem by considering limited waiting time
From MaRDI portal
Publication:6593195
DOI10.3934/jimo.2024058MaRDI QIDQ6593195
Beren Gürsoy Yılmaz, Fatma Betul Yeni, Omer Faruk Yilmaz
Publication date: 26 August 2024
Published in: Journal of Industrial and Management Optimization (Search for Journal in Brave)
lot streaminglimited waiting timemulti-objective hybrid flowshop schedulingnon-dominated sorting genetic algorithm-II (NSGA-II)sublot division methodologies
Mixed integer programming (90C11) Deterministic scheduling theory in operations research (90B35) Combinatorial optimization (90C27)
This page was built for publication: Comparison of lot streaming division methodologies for multi-objective hybrid flowshop scheduling problem by considering limited waiting time