A note: minmax due-window assignment with fixed earliness-tardiness costs
From MaRDI portal
Publication:6593204
DOI10.3934/jimo.2024064MaRDI QIDQ6593204
Publication date: 26 August 2024
Published in: Journal of Industrial and Management Optimization (Search for Journal in Brave)
Cites Work
- Minmax scheduling problems with a common due-window
- Minmax scheduling and due-window assignment with position-dependent processing times and job rejection
- Due-window assignment scheduling problem with stochastic processing times
- Improved algorithms for proportionate flow shop scheduling with due-window assignment
- Due-window assignment scheduling with learning and deterioration effects
- Due-window assignment scheduling with past-sequence-dependent setup times
- Scheduling with common due date assignment to minimize generalized weighted earliness-tardiness penalties
- A survey on scheduling problems with due windows
- Resource allocation flowshop scheduling with learning effect and slack due window assignment
- Single machine scheduling with common assignable due date/due window to minimize total weighted early and late work
- Common due window size and location determination in a single machine scheduling problem
- Single-machine minmax common due-window assignment and scheduling problems with convex resource allocation
- Slack due window assignment scheduling in the single-machine with controllable processing times
- Due-window assignment scheduling with job-rejection, truncated learning effects and setup times
- Common due-window assignment for single-machine scheduling with generalized earliness/tardiness penalties and a rate-modifying activity
- Hyper-heuristic for integrated due-window scheduling and vehicle routing problem for perishable products considering production quality
- Common due-window assignment and minmax scheduling with resource allocation and group technology on a single machine
- Single machine slack due window assignment and deteriorating jobs
This page was built for publication: A note: minmax due-window assignment with fixed earliness-tardiness costs