A heuristic bicriteria scheduling approach for a flooring production planning problem
From MaRDI portal
Publication:6606603
DOI10.1007/978-3-031-24907-5_67zbMATH Open1547.90088MaRDI QIDQ6606603
D. Leib, T. Heller, Elisabeth Finhold
Publication date: 17 September 2024
Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Production models (90B30)
Cites Work
This page was built for publication: A heuristic bicriteria scheduling approach for a flooring production planning problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6606603)