Scheduling unrelated parallel machines with attribute-dependent setup times: a case study
From MaRDI portal
Publication:6606606
DOI10.1007/978-3-031-24907-5_69zbMATH Open1547.90085MaRDI QIDQ6606606
Neele Leithäuser, Sebastian Velten, Sven Jäger, Christian Weiß
Publication date: 17 September 2024
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Cites Work
This page was built for publication: Scheduling unrelated parallel machines with attribute-dependent setup times: a case study
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6606606)