The repair kit problem with fixed delivery costs
From MaRDI portal
Publication:6606703
DOI10.1007/978-3-031-08623-6_56zbMATH Open1548.90047MaRDI QIDQ6606703
Publication date: 17 September 2024
Stochastic programming (90C15) Approximation methods and heuristics in mathematical programming (90C59) Inventory, storage, reservoirs (90B05)
Cites Work
- Multiple period repair kit problem with a job completion criterion: A case study
- An efficient optimal solution method for the joint replenishment problem
- The repair kit problem with positive replenishment lead times and fixed ordering costs
- The multiple-job repair kit problem
- A review of the joint replenishment problem literature: 1989--2005
- Optimising a general repair kit problem with a service constraint
- Improving spare parts management for field services: a model and a case study for the repair kit problem
This page was built for publication: The repair kit problem with fixed delivery costs