Approximating weighted completion time via stronger negative correlation
From MaRDI portal
Publication:6620463
DOI10.1007/S10951-023-00780-YzbMATH Open1548.90189MaRDI QIDQ6620463
Aravind Srinivasan, Alok Baveja, Xiaoran Qu
Publication date: 16 October 2024
Published in: Journal of Scheduling (Search for Journal in Brave)
Cites Work
- Title not available (Why is that?)
- Title not available (Why is that?)
- Minimizing average completion time in the presence of release dates
- An approximation algorithm for the generalized assignment problem
- Pipage rounding: a new method of constructing algorithms with proven performance guarantee
- Computing and software science. State of the art and perspectives
- A PTAS for minimizing the weighted sum of job completion times on parallel machines
- Non-approximability results for scheduling problems with minsum criteria
- Convex quadratic and semidefinite programming relaxations in scheduling
- A unified approach to scheduling on unrelated parallel machines
- A new approximation technique for resource‐allocation problems
- Lift-and-Round to Improve Weighted Completion Time on Unrelated Machines
- Scheduling to Minimize Total Weighted Completion Time via Time-Indexed Linear Programming Relaxations
- Weighted Completion Time Minimization for Unrelated Machines via Iterative Fair Contention Resolution
- On a generalization of iterated and randomized rounding
- A Measure of Asymptotic Efficiency for Tests of a Hypothesis Based on the sum of Observations
This page was built for publication: Approximating weighted completion time via stronger negative correlation
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6620463)