An exact solution with an improved running time for the routing flow shop problem with two machines
From MaRDI portal
Publication:6620464
DOI10.1007/s10951-023-00784-8zbMATH Open1548.90198MaRDI QIDQ6620464
Alexander V. Kononov, Ilya Chernykh, Sergey Sevast'janov
Publication date: 16 October 2024
Published in: Journal of Scheduling (Search for Journal in Brave)
Deterministic scheduling theory in operations research (90B35) Deterministic network models in operations research (90B10) Dynamic programming (90C39)
Cites Work
- Unnamed Item
- Routing open shop and flow shop scheduling problems
- The museum visitor routing problem
- The routing open-shop problem on a network: complexity and approximation
- A polynomial-time algorithm for the routing flow shop problem with two machines: an asymmetric network with a fixed number of nodes
- Heuristic Solution Algorithm for Routing Flow Shop with Buffers and Ready Times
- Improved Approximation Algorithms for Routing Shop Scheduling
- The Complexity of Flowshop and Jobshop Scheduling
- Routing Two-Machine Flowshop Problems on Networks with Special Structure
- A Simple Heuristic for m-Machine Flow-Shop and its Applications in Routing-Scheduling Problems
This page was built for publication: An exact solution with an improved running time for the routing flow shop problem with two machines