The assignment of project managers to projects in an uncertain dynamic environment
DOI10.1007/s10479-024-05958-xMaRDI QIDQ6644379
Saeed Poormoaied, Aidin Rezaeian, Hamidreza Koosha, Mohammad R. Ranjbar
Publication date: 27 November 2024
Published in: Annals of Operations Research (Search for Journal in Brave)
stochastic dynamic programmingproject managementheuristic algorithmmulti-stage stochastic programmingstochastic generalized assignment problem
Integer programming (90C10) Stochastic programming (90C15) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Dynamic programming (90C39) Discrete location and assignment (90B80)
Cites Work
- Title not available (Why is that?)
- Assignment problems: a golden anniversary survey
- A stochastic model for the patient-bed assignment problem with random arrivals and departures
- An application of dynamic programming to assign pressing tanks at wineries
- Group consensus reaching based on a combination of expert weight and expert reliability
- Exact solutions to a class of stochastic generalized assignment problems
- Model Predictive Control for Stochastic Resource Allocation
- Scheduling
This page was built for publication: The assignment of project managers to projects in an uncertain dynamic environment
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6644379)