Sequencing and scheduling for filling lines in dairy production
From MaRDI portal
Publication:691446
DOI10.1007/s11590-011-0336-9zbMath1259.90033OpenAlexW2060770415MaRDI QIDQ691446
Wiebke Höhn, Torsten Gellert, Rolf H. Möhring
Publication date: 30 November 2012
Published in: Optimization Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s11590-011-0336-9
Related Items (3)
Integrated production scheduling and distribution planning in dairy supply chain by hybrid modelling ⋮ Classifying and modeling setups and cleanings in lot sizing and scheduling ⋮ Solving a Rich Position-Based Model for Dairy Products
Uses Software
Cites Work
- Unnamed Item
- A note on two problems in connexion with graphs
- Job shop scheduling with setup times, deadlines and precedence constraints
- Two local search approaches for solving real-life car sequencing problems
- Optimal production scheduling for the dairy industry
- Evolution algorithms in combinatorial optimization
- An effective implementation of the Lin-Kernighan traveling salesman heuristic
- Scheduling with batching: A review
- A survey of scheduling problems with setup times or costs
- Single-machine scheduling problems with past-sequence-dependent setup times
- Capacitated lot sizing and scheduling with parallel machines and shared buffers: A case study in a packaging company
- Integrated Sequencing and Scheduling in Coil Coating
- The Traveling Salesman Problem with Distances One and Two
This page was built for publication: Sequencing and scheduling for filling lines in dairy production