Minimizing makespan in a two-machine flow shop with effects of deterioration and learning

From MaRDI portal
Publication:694178

DOI10.1007/s11590-011-0334-yzbMath1259.90039OpenAlexW2116082811MaRDI QIDQ694178

Dan Wang, Ji-Bo Wang, Ping Ji, Cheng, T. C. Edwin

Publication date: 11 December 2012

Published in: Optimization Letters (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1007/s11590-011-0334-y




Related Items (21)

Scheduling deteriorating jobs with a learning effect on unrelated parallel machinesScheduling with a position-weighted learning effect and job release datesA note on ``Single-machine scheduling problems with both deteriorating jobs and learning effectsTri-criteria single machine scheduling model with release times and learning factorSingle machine scheduling with general time-dependent deterioration, position-dependent learning and past-sequence-dependent setup timesScheduling jobs with truncated exponential learning functionsAn iterated greedy heuristic for no-wait flow shops with sequence dependent setup times, learning and forgetting effectsSingle-machine group scheduling with general deterioration and learning effectsOptimal due-date assignment problem with learning effect and resource-dependent processing timesUnrelated parallel-machine scheduling with deteriorating maintenance activities to minimize the total completion timeSingle-machine scheduling with accelerating deterioration effectsSingle machine scheduling with exponential learning functionsSome results of the worst-case analysis for flow shop scheduling with a learning effectFlow Shop Resource Allocation Scheduling with Due Date Assignment, Learning Effect and Position-Dependent WeightsSingle-machine ready times scheduling with group technology and proportional linear deteriorationResearch on single-machine scheduling with position-dependent weights and past-sequence-dependent delivery timesThe single-machine total tardiness problem with unequal release times and a linear deteriorationSingle-machine scheduling problems with precedence constraints and simple linear deteriorationA Note on Scheduling Jobs with Extended Sum-of-Processing-Times-Based and Position-Based Learning EffectA NOTE ON "SCHEDULING PROBLEMS WITH THE EFFECTS OF DETERIORATION AND LEARNING"Two-machine flow shop scheduling with a common due date to maximize total early work



Cites Work


This page was built for publication: Minimizing makespan in a two-machine flow shop with effects of deterioration and learning