Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Single machine scheduling with nonlinear lateness cost functions and fuzzy due dates

From MaRDI portal
Publication:697023
Jump to:navigation, search

DOI10.1016/S1468-1218(01)00030-XzbMath1006.90045MaRDI QIDQ697023

M. C. Fu

Publication date: 12 September 2002

Published in: Nonlinear Analysis. Real World Applications (Search for Journal in Brave)


zbMATH Keywords

genetic algorithmsfuzzy due datesfuzzy schedulingnonlinear lateness cost


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Fuzzy and other nonstochastic uncertainty mathematical programming (90C70)


Related Items (2)

An information axiom based decision making approach under hybrid uncertain environments ⋮ Survey on fuzzy shop scheduling



Cites Work

  • Single value simulation of fuzzy variable
  • The mean value of a fuzzy number
  • Fuzzy sets and systems. Theory and applications
  • The expected value of a fuzzy number
  • Two scheduling problems with fuzzy due-dates
  • Scheduling arrivals to a production system in a fuzzy environment
  • One machine scheduling problem with fuzzy duedates
  • Unnamed Item
  • Unnamed Item
  • Unnamed Item
  • Unnamed Item




This page was built for publication: Single machine scheduling with nonlinear lateness cost functions and fuzzy due dates

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:697023&oldid=12606807"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 30 January 2024, at 09:53.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki