Two-machine flow shop scheduling with nonregular criteria
From MaRDI portal
Publication:702362
DOI10.1023/B:JMMA.0000036573.01968.1bzbMath1087.90029OpenAlexW2025426217WikidataQ57633935 ScholiaQ57633935MaRDI QIDQ702362
Jatinder N. D. Gupta, Frank Werner, Volker Lauff
Publication date: 17 January 2005
Published in: JMMA. Journal of Mathematical Modelling and Algorithms (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1023/b:jmma.0000036573.01968.1b
Polyhedral combinatorics, branch-and-bound, branch-and-cut (90C57) Deterministic scheduling theory in operations research (90B35) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20)
Related Items (1)
This page was built for publication: Two-machine flow shop scheduling with nonregular criteria