Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Two-machine flow shop scheduling with nonregular criteria

From MaRDI portal
Publication:702362
Jump to:navigation, search

DOI10.1023/B:JMMA.0000036573.01968.1bzbMath1087.90029OpenAlexW2025426217WikidataQ57633935 ScholiaQ57633935MaRDI QIDQ702362

Jatinder N. D. Gupta, Frank Werner, Volker Lauff

Publication date: 17 January 2005

Published in: JMMA. Journal of Mathematical Modelling and Algorithms (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1023/b:jmma.0000036573.01968.1b


zbMATH Keywords

branch and boundflow shopSchedulingcommon due dateenumerative algorithmnon-regular criterion


Mathematics Subject Classification ID

Polyhedral combinatorics, branch-and-bound, branch-and-cut (90C57) Deterministic scheduling theory in operations research (90B35) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20)


Related Items (1)

Heuristic and exact algorithms for the two-machine just in time job shop scheduling problem






This page was built for publication: Two-machine flow shop scheduling with nonregular criteria

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:702362&oldid=12614178"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 30 January 2024, at 09:56.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki