LSSPER: Solving the resource-constrained project scheduling problem with large neighbourhood search

From MaRDI portal
Publication:702729

DOI10.1023/B:ANOR.0000039521.26237.62zbMath1066.90037OpenAlexW2041080861MaRDI QIDQ702729

Christian Artigues, Mireille Palpant, Philippe Yves Paul Michelon

Publication date: 17 January 2005

Published in: Annals of Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1023/b:anor.0000039521.26237.62



Related Items

A polarized adaptive schedule generation scheme for the resource-constrained project scheduling problem, A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints, Time-constrained project scheduling, Principles for the design of large neighborhood search, Experimental investigation of heuristics for resource-constrained project scheduling: an update, A hybrid MIP-based large neighborhood search heuristic for solving the machine reassignment problem, A filter-and-fan approach with adaptive neighborhood switching for resource-constrained project scheduling, Applying local rescheduling in response to schedule disruptions, Models and methods for frequency assignment with cumulative interference constraints, Heuristic and metaheuristic methods for the multi‐skill project scheduling problem with partial preemption, An iterative time‐bucket refinement algorithm for a high‐resolution resource‐constrained project scheduling problem, Multi‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristic, An Improved Genetic Algorithm for the Resource-Constrained Project Scheduling Problem, Genetic Algorithm with Hybrid Integer Linear Programming Crossover Operators for the Car-Sequencing Problem, Unnamed Item, A hybrid metaheuristic for the resource-constrained project scheduling problem, Large neighborhood improvements for solving car sequencing problems, Two local search approaches for solving real-life car sequencing problems, A hybrid genetic algorithm for the resource-constrained project scheduling problem, A constraint programming approach for the resource-constrained project scheduling problem, Solving the resource-constrained project scheduling problem using filter-and-fan approach, A random key based genetic algorithm for the resource constrained project scheduling problem, Towards merging binary integer programming techniques with genetic algorithms, Time symmetry of resource constrained project scheduling with general temporal constraints and take-give resources, Augmenting priority rule heuristics with justification and rollout to solve the resource-constrained project scheduling problem, Exploring relaxation induced neighborhoods to improve MIP solutions, Scheduling technicians and tasks in a telecommunications company, Time-constrained project scheduling with adjacent resources, A survey of hybrid metaheuristics for the resource-constrained project scheduling problem, Models and solution techniques for frequency assignment problems, Hybridizing exact methods and metaheuristics: a taxonomy, A hybrid scatter search/electromagnetism meta-heuristic for project scheduling, A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem


Uses Software