Inapproximability results for no-wait job shop scheduling.
From MaRDI portal
Publication:703234
DOI10.1016/j.orl.2003.10.003zbMath1054.90042OpenAlexW2024793042MaRDI QIDQ703234
Publication date: 11 January 2005
Published in: Operations Research Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.orl.2003.10.003
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Approximation algorithms (68W25)
Related Items (6)
The proportionate two-machine no-wait job shop scheduling problem ⋮ A survey of scheduling problems with no-wait in process ⋮ No-wait job shop scheduling: tabu search and complexity of subproblems ⋮ An efficient simple metaheuristic for minimizing the makespan in two-machine no-wait job shops ⋮ Model formulations for the machine scheduling problem with limited waiting time constraints ⋮ SCHEDULING TWO-MACHINE FLOW SHOPS WITH EXACT DELAYS
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Maximum bounded 3-dimensional matching is MAX SNP-complete
- Approximability of flow shop scheduling
- Makespan minimization in open shops: A polynomial time approximation scheme
- The hardness of approximation: Gap location
- Makespan minimization in job shops
- The Three-Machine No-Wait Flow Shop is NP-Complete
- Complexity of Scheduling Shops with No Wait in Process
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Short Shop Schedules
- Makespan Minimization in No-Wait Flow Shops: A Polynomial Time Approximation Scheme
- Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem
- A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process
This page was built for publication: Inapproximability results for no-wait job shop scheduling.