Scheduling with tool changes to minimize total completion time: Basic results and SPT performance

From MaRDI portal
Publication:703937

DOI10.1016/S0377-2217(03)00232-7zbMath1067.90038OpenAlexW2074395045MaRDI QIDQ703937

M. Selim Akturk, Jay B. Ghosh, Evrim D. Güneş

Publication date: 12 January 2005

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/s0377-2217(03)00232-7




Related Items (15)

Single-machine scheduling with workload-dependent tool change durations and equal processing time jobs to minimize total completion timeMixed integer programming formulations for two-machine flow shop scheduling with an availability constraintScheduling two parallel machines with machine-dependent availabilitiesA note on worst-case performance of heuristics for maintenance scheduling problemsMinimizing total completion time on a single machine with a flexible maintenance activitySupply chain scheduling problem in the hospital with periodic working time on a single machineThe tool transporter movements problem in flexible manufacturing systemsA two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machinesAbsolute bounds of list algorithms for parallel machines scheduling with unavailability periodsSINGLE MACHINE SCHEDULING WITH FORBIDDEN INTERVALS AND JOB DELIVERY TIMESMinimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenanceScheduling with tool changes to minimize total completion time: Basic results and SPT performanceMinimizing maximum tardiness in single FMS machine scheduling with tool changesMinimizing total flow time on a single flexible machineMakespan minimization for two parallel machines scheduling with a periodic availability constraint: mathematical programming model, average-case analysis, and anomalies



Cites Work


This page was built for publication: Scheduling with tool changes to minimize total completion time: Basic results and SPT performance