Complexity of reducing the delay between two nodes by node-based and edge-based upgrading strategies
From MaRDI portal
Publication:705041
DOI10.1007/s10255-004-0196-5zbMath1104.90043OpenAlexW2035188427MaRDI QIDQ705041
Zhang, Jianzhong, Xiao-guang Yang
Publication date: 25 January 2005
Published in: Acta Mathematicae Applicatae Sinica. English Series (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10255-004-0196-5
Abstract computational complexity for mathematical programming problems (90C60) Communication networks in operations research (90B18) Combinatorial optimization (90C27) Computational difficulty of problems (lower bounds, completeness, difficulty of approximation, etc.) (68Q17)
Cites Work
- Unnamed Item
- Modifying edges of a network to obtain short subgraphs
- Approximation algorithms for certain network improvement problems
- Improving spanning trees by upgrading nodes
- Edge Weight Reduction Problems in Directed Acyclic Graphs
- Network upgrading problems
- Improving Minimum Cost Spanning Trees by Upgrading Nodes
- Upgrading bottleneck constrained forests
This page was built for publication: Complexity of reducing the delay between two nodes by node-based and edge-based upgrading strategies