Linear programming models with planned lead times for supply chain operations planning
From MaRDI portal
Publication:706867
DOI10.1016/j.ejor.2004.01.019zbMath1071.90512OpenAlexW2045657584MaRDI QIDQ706867
J. M. Spitter, A. G. de Kok, Ebbe G. Negenman, Cor A. J. Hurkens, Jan Karel Lenstra
Publication date: 9 February 2005
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2004.01.019
Related Items (13)
Mathematical programming model for centralised master planning in ceramic tile supply chains ⋮ An explicit analysis of the lead time syndrome: stability condition and performance evaluation ⋮ Designing optimal global supply chains at Dow AgroSciences ⋮ Lead time anticipation in supply chain operations planning ⋮ Fuzzy scheduling of a build-to-order supply chain ⋮ Integer programming models for mid-term production planning for high-tech low-volume supply chains ⋮ The double pivot simplex method ⋮ Supply chain management and advanced planning -- basics, overview and challenges ⋮ Supply chain management in forestry -- case studies at Södra cell AB ⋮ A methodology for controlling dispersion in food production and distribution ⋮ Conic programming models for production planning with clearing functions: formulations and duality ⋮ Setting safety stocks in multi-stage inventory systems under rolling horizon mathematical programming models ⋮ Aggregate overhaul and supply chain planning for rotables
Cites Work
This page was built for publication: Linear programming models with planned lead times for supply chain operations planning