An alternative to safety stock policies for multi-level rolling schedule MRP problems
From MaRDI portal
Publication:706875
DOI10.1016/j.ejor.2004.01.020zbMath1071.90530OpenAlexW2169577312MaRDI QIDQ706875
Nico P. Dellaert, Jully Jeunet
Publication date: 9 February 2005
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://basepub.dauphine.fr/handle/123456789/2962
Related Items (3)
The stochastic dynamic product cycling problem ⋮ Supply chain management and advanced planning -- basics, overview and challenges ⋮ Supply chain management in forestry -- case studies at Södra cell AB
Cites Work
- Unnamed Item
- Production scheduling and sequencing for multi-stage production systems
- Multiple level production planning in rolling horizon assembly environments
- Dynamic Version of the Economic Lot Size Model
- Improved Rolling Schedules for the Dynamic Single-Level Lot-Sizing Problem
- Rolling Horizon Procedures for the Facilities in Series Inventory Model with Nested Schedules
- Comparative analysis of lot-sizing models for multi-stage systems: a simulation study
- Improved Heuristics for Multi-Stage Requirements Planning Systems
- An Analytic Framework for Evaluating Rolling Schedules
This page was built for publication: An alternative to safety stock policies for multi-level rolling schedule MRP problems