Scheduling preemptive open shops to minimize total tardiness
From MaRDI portal
Publication:707141
DOI10.1016/j.ejor.2003.10.010zbMath1132.90330OpenAlexW2010505063MaRDI QIDQ707141
Publication date: 9 February 2005
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2003.10.010
Polyhedral combinatorics, branch-and-bound, branch-and-cut (90C57) Deterministic scheduling theory in operations research (90B35)
Related Items (2)
A new particle swarm optimization for multi-objective open shop scheduling ⋮ A study on open shop scheduling to minimise total tardiness
Cites Work
- Scheduling ordered open shops
- On the complexity of preemptive open-shop scheduling problems
- Minimizing Total Tardiness on One Machine is NP-Hard
- A Note on Open Shop Preemptive Schedules
- Preemptive Scheduling of Independent Jobs with Release and Due Times on Open, Flow and Job Shops
- Minimizing Maximum Lateness in a Two-Machine Open Shop
- Open Shop Scheduling to Minimize Finish Time
- A dual algorithm for the one-machine scheduling problem
- A General Bounding Scheme for the Permutation Flow-Shop Problem
- Dynamic Programming Solution of Sequencing Problems with Precedence Constraints
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
This page was built for publication: Scheduling preemptive open shops to minimize total tardiness