Makespan minimization in machine dominated flowshop
From MaRDI portal
Publication:708144
DOI10.1016/j.amc.2010.05.022zbMath1230.90088OpenAlexW1999018784MaRDI QIDQ708144
Larry E. Parten, Rafael Moras, Paul X. Uhlig, Gopalakrishnan Easwaran
Publication date: 11 October 2010
Published in: Applied Mathematics and Computation (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.amc.2010.05.022
Related Items (4)
Reduction of permutation flowshop problems to single machine problems using machine dominance relations ⋮ Minimizing total weighted completion time in a two-machine flow shop scheduling under simple linear deterioration ⋮ Reducing network and computation complexities in neural based real-time scheduling scheme ⋮ Study on flow shop scheduling with sum-of-logarithm-processing-times-based learning effects
Cites Work
- Makespan distribution of permutation flowshop schedules
- Permutation flow shop scheduling with dominant machines to minimize discounted total weighted completion time
- Flow shop scheduling problems with decreasing linear deterioration under dominant machines
- A note on flow shop scheduling problems with a learning effect on no-idle dominant machines
- Erratum to: ``A note on flow shop scheduling problems with a learning effect on no-idle dominant machines by M. Cheng et al.
- Flow-shops with a dominant machine
- Flowshop scheduling with dominant machines
- Nonpreemptive flowshop scheduling with machine dominance
- No-wait or no-idle permutation flowshop scheduling with dominating machines
- Optimal two- and three-stage production schedules with setup times included
- Flow shop scheduling problems with deteriorating jobs under dominating machines
- Scheduling
This page was built for publication: Makespan minimization in machine dominated flowshop