A new lower bound for the resource-constrained project scheduling problem with generalized precedence relations
From MaRDI portal
Publication:709101
DOI10.1016/j.cor.2009.07.003zbMath1231.90177OpenAlexW2042604367MaRDI QIDQ709101
Massimiliano Caramia, Lucio Bianco
Publication date: 15 October 2010
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: http://hdl.handle.net/2108/914
Related Items (7)
Solving multi-mode time–cost–quality trade-off problems under generalized precedence relations ⋮ An iterative time‐bucket refinement algorithm for a high‐resolution resource‐constrained project scheduling problem ⋮ An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relations ⋮ An updated survey of variants and extensions of the resource-constrained project scheduling problem ⋮ A new lower bound for the resource-constrained project scheduling problem with generalized precedence relations ⋮ Approximability results for the resource-constrained project scheduling problem with a single type of resources ⋮ Simplifying activity networks under generalized precedence relations to extended CPM networks
Cites Work
- Unnamed Item
- A new lower bound for the resource-constrained project scheduling problem with generalized precedence relations
- Scheduling subject to resource constraints: Classification and complexity
- A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations
- Project scheduling. A research handbook.
- Computing lower bounds by destructive improvement: An application to resource-constrained project scheduling
- Project scheduling with time windows. From theory to applications.
- A new formulation of the resource-unconstrained project scheduling problem with generalized precedence relations to minimize the completion time
- The Analysis of Activity Networks Under Generalized Precedence Relations (GPRs)
- Simple and Fast Algorithms for Linear and Integer Programs with Two Variables Per Inequality
- A Branch-and-Bound Procedure for the Generalized Resource-Constrained Project Scheduling Problem
- New Benchmark Results for the Resource-Constrained Project Scheduling Problem
This page was built for publication: A new lower bound for the resource-constrained project scheduling problem with generalized precedence relations