A two-machine flowshop problem with two agents

From MaRDI portal
Publication:709115

DOI10.1016/j.cor.2010.04.002zbMath1231.90204OpenAlexW2081899110MaRDI QIDQ709115

D. Kharzeev

Publication date: 15 October 2010

Published in: Computers \& Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.cor.2010.04.002




Related Items (21)

Total tardiness minimization in permutation flowshop with deterioration considerationParallel-machine scheduling to minimize makespan with fuzzy processing times and learning effectsMulti-agent scheduling in a no-wait flow shop system to maximize the weighted number of just-in-time jobsTwo-agent scheduling in a flowshopSingle machine scheduling with interfering job setsA scheduling problem with three competing agentsScheduling problems with two competing agents to minimized weighted earliness-tardinessTwo-agent singe-machine scheduling with release times to minimize the total weighted completion timeAn investigation on a two-agent single-machine scheduling problem with unequal release datesSingle machine scheduling problem with two synergetic agents and piece-rate maintenanceScheduling Two-Agents with a Time-Dependent Deterioration to Minimize the Minsum Earliness MeasuresAlgorithms for a two‐machine flowshop problem with jobs of two classesTwo-Machine and Two-Agent Flow Shop with Special Processing Times StructuresA two-agent single-machine scheduling problem to minimize the total cost with release datesA two-agent single-machine scheduling problem with late work criteriaScheduling problems with two agents and a linear non-increasing deterioration to minimize earliness penaltiesScheduling two agents with sum-of-processing-times-based deterioration on a single machineTwo-agent-based single-machine scheduling with switchover time to minimize total weighted completion time and makespan objectivesA common framework and taxonomy for multicriteria scheduling problems with interfering and competing jobs: multi-agent scheduling problemsTwo-agent scheduling with position-based deteriorating jobs and learning effectsA two-machine no-wait flow shop problem with two competing agents



Cites Work


This page was built for publication: A two-machine flowshop problem with two agents