Project bidding under deterministic and probabilistic activity durations
From MaRDI portal
Publication:721677
DOI10.1016/0377-2217(90)90117-TzbMath1403.90318MaRDI QIDQ721677
Publication date: 19 July 2018
Published in: European Journal of Operational Research (Search for Journal in Brave)
Related Items
Resource allocation for a stochastic CPM-type network through perturbation analysis, A comparison of stochastic scheduling rules for maximizing project net present value, A classified bibliography of recent research relating to project risk management, Activity nets: A guided tour through some recent developments, Evaluation of the quantiles and superquantiles of the makespan in interval valued activity networks, Simple probability models for project contracting, A review of the contribution of operational research to project management, An integer linear programming model and a modified branch and bound algorithm for the project material requirements planning problem, Neural network as a simulation metamodel in economic analysis of risky projects
Cites Work
- Unnamed Item
- Approximating the Criticality Indices of the Activities in PERT Networks
- Scheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach
- Unbalanced Highway Contract Tendering
- Application of a Technique for Research and Development Program Evaluation
- Cash Flows in Networks
- The payment scheduling problem