Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

A multi-stage non-deterministic model for project scheduling under resources constraints

From MaRDI portal
Publication:721683
Jump to:navigation, search

DOI10.1016/0377-2217(90)90123-SzbMath1403.90296OpenAlexW2167715079MaRDI QIDQ721683

D. Kharzeev

Publication date: 19 July 2018

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/0377-2217(90)90123-s

zbMATH Keywords

schedulingproject management


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35) Production models (90B30)


Related Items

Early-tardy cost trade-offs in resource constrained projects with cash flows: An optimization-guided heuristic approach, A stochastic model to control project duration and expenditure, The discrete time-cost tradeoff problem revisited, The scheduling of activities to maximize the net present value of projects, A review of the contribution of operational research to project management, A genetic algorithm for multi-mode resource constrained project scheduling problem



Cites Work

  • Optimal resource profiles for program scheduling
  • Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
  • Unnamed Item
Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:721683&oldid=12644402"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 30 January 2024, at 11:19.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki