Synchronous flow shop scheduling with pliable jobs
From MaRDI portal
Publication:723997
DOI10.1016/J.EJOR.2018.04.024zbMath1403.90307OpenAlexW2799693042WikidataQ129949327 ScholiaQ129949327MaRDI QIDQ723997
Stefan Waldherr, Sigrid Knust, Matthias Bultmann
Publication date: 25 July 2018
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2018.04.024
Abstract computational complexity for mathematical programming problems (90C60) Deterministic scheduling theory in operations research (90B35)
Related Items (2)
A combinatorial analysis of the permutation and non-permutation flow shop scheduling problems ⋮ Shop scheduling problems with pliable jobs
Cites Work
- Unnamed Item
- Solution algorithms for synchronous flow shop problems with two dominating machines
- Scheduling three-operation jobs in a two-machine flow shop to minimize makespan
- Properties of optimal schedules in preemptive shop scheduling
- Complexity results for flow shop problems with synchronous movement
- Open shop scheduling with synchronization
- Decomposition algorithms for synchronous flow shop problems with additional resources and setup times
- Integer preemptive scheduling on parallel machines
- Benchmarks for basic scheduling problems
- Scheduling with Deadlines and Loss Functions
- Optimal two- and three-stage production schedules with setup times included
- The Complexity of Flowshop and Jobshop Scheduling
- Sequencing jobs on an automobile assembly line: objectives and procedures
- Sequencing and scheduling in flowshops with task redistribution
- Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem
- Flow shop-sequencing problem with synchronous transfers and makespan minimization
This page was built for publication: Synchronous flow shop scheduling with pliable jobs