Maximising the weighted number of activity execution modes in project planning
From MaRDI portal
Publication:724006
DOI10.1016/j.ejor.2018.04.035zbMath1403.90308OpenAlexW2800428602WikidataQ129971706 ScholiaQ129971706MaRDI QIDQ724006
Jeroen Burgelman, Mario Vanhoucke
Publication date: 25 July 2018
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2018.04.035
Related Items (2)
Consistency checking of STNs with decisions: managing temporal and access-control constraints in a seamless way ⋮ Polyhedral Results and Branch-and-Cut for the Resource Loading Problem
Uses Software
Cites Work
- MIP models for resource-constrained project scheduling with flexible resource profiles
- Scheduling resource-constrained projects with a flexible project structure
- An iterative approach for reducing the impact of infrastructure maintenance on the performance of railway systems
- Production scheduling with alternative process plans
- Applying local rescheduling in response to schedule disruptions
- Project scheduling with finite or infinite number of activity processing modes -- a survey
- Event-based MILP models for resource-constrained project scheduling problems
- A survey of variants and extensions of the resource-constrained project scheduling problem
- A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes
- PSPLIB -- a project scheduling problem library
- Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application
- An exact algorithm for project scheduling with multiple modes
- Resource-constrained project scheduling: A survey of recent developments.
- Job-shop scheduling with processing alternatives.
- Project scheduling. A research handbook.
- Constraint-directed techniques for scheduling alternative activities
- A linear programming and constraint propagation-based lower bound for the RCPSP
- Project scheduling under uncertainty: survey and research potentials
- Maximization of solution flexibility for robust shop scheduling
- Network decomposition-based benchmark results for the discrete time-cost tradeoff problem
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Scheduling of resource-constrained projects
- An evaluation of constructive heuristic methods for solving the alternative subgraphs assembly line balancing problem
- Proactive policies for the stochastic resource-constrained project scheduling problem
- Project planning with alternative technologies in uncertain environments
- On Uncertainty, Ambiguity, and Complexity in Project Management
- Scheduling preventive railway maintenance activities
- Optimal Search for the Best Alternative
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- Disruption management for resource-constrained project scheduling
- Solving Resource-Constrained Network Problems by Implicit Enumeration—Nonpreemptive Case
This page was built for publication: Maximising the weighted number of activity execution modes in project planning