A branch-and-bound algorithm for solving a two-machine flow shop problem with deteriorating jobs

From MaRDI portal
Publication:733523

DOI10.1016/j.cor.2009.03.019zbMath1171.90404OpenAlexW2072723821MaRDI QIDQ733523

D. Kharzeev

Publication date: 16 October 2009

Published in: Computers \& Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.cor.2009.03.019




Related Items (30)

Total tardiness minimization in permutation flowshop with deterioration considerationPermutation flowshop scheduling with simple linear deteriorationSINGLE-MACHINE SCHEDULING WITH PROPORTIONALLY DETERIORATING JOBS SUBJECT TO AVAILABILITY CONSTRAINTSScheduling problems with past-sequence-dependent setup times and general effects of deterioration and learningSingle-machine scheduling with logarithm deteriorationSingle-machine scheduling with deteriorating functions for job processing timesParallel-batching scheduling of deteriorating jobs with non-identical sizes and rejection on a single machineTwo-machine flow shop total tardiness scheduling problem with deteriorating jobsThe study of group scheduling problems with general dual-position-based job processing timesMinimizing total weighted completion time in a two-machine flow shop scheduling under simple linear deteriorationSingle-machine scheduling with time-and-resource-dependent processing timesTabu search algorithms for minimizing total completion time on a single machine with an actual time-dependent learning effectRescheduling problems with agreeable job parameters to minimize the tardiness costs under deterioration and disruptionConsiderations of single-machine scheduling with deteriorating jobsUnrelated parallel-machine scheduling with position-dependent deteriorating jobs and resource-dependent processing timeA branch-and-bound algorithm for minimizing the energy consumption in the PFS problemSome single-machine and flowshop scheduling problems with a non-linear deterioration functionA single-machine scheduling with a truncated linear deterioration and ready timesScheduling piecewise linear deteriorating jobs to minimize makespan in a two-machine flowshopScheduling time-dependent jobs under mixed deteriorationMinimizing makespan in a two-machine flow shop with effects of deterioration and learningSingle-machine total completion time scheduling with a time-dependent deteriorationSingle-machine makespan minimization scheduling with nonlinear shortening processing timesSingle-machine scheduling with deteriorating jobs and past-sequence-dependent setup timesMinimizing Makespan in Permutation Flow Shop Scheduling with Proportional DeteriorationFlow shops with machine maintenance: ordered and proportionate casesND-agent scheduling of linear-deteriorating tasks with positional due indices to minimize total completion time and maximum costParallel-batching machines scheduling problem with a truncated time-dependent learning effect via a hybrid CS-JADE algorithmPermutation Flow Shop Problem with Shortening Job Processing TimesMAKESPAN MINIMIZATION ON THREE-MACHINE FLOW SHOP WITH DETERIORATING JOBS



Cites Work


This page was built for publication: A branch-and-bound algorithm for solving a two-machine flow shop problem with deteriorating jobs