Tight MIP formulations of the power-based unit commitment problem
From MaRDI portal
Publication:747751
DOI10.1007/s00291-015-0400-4zbMath1326.90034OpenAlexW1504470287WikidataQ59403034 ScholiaQ59403034MaRDI QIDQ747751
Andres Ramos, Germán Morales-España, Claudio Gentile
Publication date: 19 October 2015
Published in: OR Spectrum (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s00291-015-0400-4
convex hullmixed integer programmingunit commitmentquick-start unitsslow-start unitstight formulation
Mixed integer programming (90C11) Stochastic scheduling theory in operations research (90B36) Economic models of real-world systems (e.g., electricity markets, etc.) (91B74)
Related Items (10)
Tight MIP formulations for bounded up/down times and interval-dependent start-ups ⋮ The min-up/min-down unit commitment polytope ⋮ Tighter MIP formulations for the discretised unit commitment problem with MIN-stop ramping constraints ⋮ A tight MIP formulation of the unit commitment problem with start-up and shut-down constraints ⋮ Parallel matheuristics for the discrete unit commitment problem with min‐stop ramping constraints ⋮ The Ramping Polytope and Cut Generation for the Unit Commitment Problem ⋮ Large-scale unit commitment under uncertainty: an updated literature survey ⋮ On the complexity of the unit commitment problem ⋮ Quantitative solutions for future energy systems and markets ⋮ Learning to Solve Large-Scale Security-Constrained Unit Commitment Problems
Cites Work
- Unnamed Item
- Unnamed Item
- A polyhedral study of production ramping
- Large-scale unit commitment under uncertainty
- Min-up/min-down polytopes
- A tight MIP formulation of the unit commitment problem with start-up and shut-down constraints
- Solving Nonlinear Single-Unit Commitment Problems with Ramping Constraints
This page was built for publication: Tight MIP formulations of the power-based unit commitment problem