The connection between the bump number problem and flow-shop scheduling with precedence constraints
From MaRDI portal
Publication:753673
DOI10.1016/0898-1221(90)90214-5zbMath0716.90056OpenAlexW1995353009MaRDI QIDQ753673
Publication date: 1990
Published in: Computers \& Mathematics with Applications (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0898-1221(90)90214-5
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Minimizing bumps in linear extensions of ordered sets
- Greedy posets for the bump-minimizing problem
- Computing the bump number is easy
- Computing the bump number with techniques from two-processor scheduling
- Minimizing bumps in ordered sets by substitution decomposition
- A comparison of algorithms for minimizing bumps in linear extensions of partial orders
- Optimal two- and three-stage production schedules with setup times included
- On Some Variants of the Bandwidth Minimization Problem
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
This page was built for publication: The connection between the bump number problem and flow-shop scheduling with precedence constraints