A robust two-machine flow-shop scheduling model with scenario-dependent processing times
From MaRDI portal
Publication:782088
DOI10.1155/2020/3530701zbMath1459.90095OpenAlexW3034714867MaRDI QIDQ782088
Lini Duan, Chin-Chia Wu, Juin-Han Chen, Chia-Lun Hsu, Win-Chin Lin, Jan-Ray Liao
Publication date: 22 July 2020
Published in: Discrete Dynamics in Nature and Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2020/3530701
Related Items (1)
Cites Work
- Unnamed Item
- Optimization by Simulated Annealing
- Single machine scheduling problems with uncertain parameters and the OWA criterion
- A multi-restart iterated local search algorithm for the permutation flow shop problem minimizing total flow time
- Cloud theory-based simulated annealing approach for scheduling in the two-stage assembly flowshop
- Minimizing the number of late jobs on a single machine under due date uncertainty
- On the robust single machine scheduling problem
- Complexity of single machine scheduling problems under scenario-based uncertainty
- An iterated local search algorithm for the permutation flowshop problem with total flowtime criterion
- Hybrid genetic algorithm for permutation flowshop scheduling problems with total flowtime minimization
- Flowshop sequencing with mean flowtime objective
- The two-machine total completion time flow shop problem
- Robust discrete optimization and its applications
- An improved branch-and-bound algorithm for the two machine total completion time flow shop problem
- Minimizing the makespan for a two-stage three-machine assembly flow shop problem with the sum-of-processing-time based learning effect
- Dynamic facility layout problem based on open queuing network theory
- A family of inequalities valid for the robust single machine scheduling polyhedron
- A new heuristic for the n-job, M-machine flow-shop problem
- Two-machine flowshop scheduling to minimize mean flow time
- Minimizing Total Completion Time in a Two-Machine Flowshop: Analysis of Special Cases
- Optimal two- and three-stage production schedules with setup times included
- Heuristic algorithms for continuous flow-shop problem
- Exact, Approximate, and Guaranteed Accuracy Algorithms for the Flow-Shop Problem n / 2 / F / F¯
- Flowshop and Jobshop Schedules: Complexity and Approximation
- No-wait flowshops with bicriteria of makespan and total completion time
- An asymptotic two-phase algorithm to minimize total flow time for a two-machine flowshop
- Heuristic-Programming Solution of a Flowshop-Scheduling Problem
- Robust Scheduling to Hedge Against Processing Time Uncertainty in Single-Stage Production
This page was built for publication: A robust two-machine flow-shop scheduling model with scenario-dependent processing times