Preemptive scheduling of independent jobs on parallel machines subject to financial constraints

From MaRDI portal
Publication:791440

DOI10.1016/0377-2217(84)90105-XzbMath0535.90045OpenAlexW2091951427MaRDI QIDQ791440

Slowinski, Roman

Publication date: 1984

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/0377-2217(84)90105-x



Related Items

Polynomial algorithms for single machine scheduling problems with financial constraints, Bi-objective optimization algorithms for joint production and maintenance scheduling under a global resource constraint: application to the permutation flow shop problem, Minimizing makespan on a single machine with release dates and inventory constraints, Approximation schemes for single machine scheduling with non-renewable resource constraints, Lower bounds for the event scheduling problem with consumption and production of resources, Scheduling unit-time tasks in renewable resource constrained flowshops, A multivariate complexity analysis of the material consumption scheduling problem, Approximation schemes for parallel machine scheduling with non-renewable resources, A PTAS for a resource scheduling problem with arbitrary number of parallel machines, Reductions between scheduling problems with non-renewable resources and knapsack problems, Production scheduling problems in a textile industry, Preemptive scheduling with staircase and piecewise linear resource availability, Stochastic scheduling to minimize expected maximum lateness, Single machine scheduling problems with financial resource constraints: some complexity results and properties, EPTAS for load balancing problem on parallel machines with a non-renewable resource, Mathematical Modeling of Scheduling Problems, Solving a bicriteria scheduling problem on unrelated parallel machines occurring in the glass bottle industry, Minimizing total weighted completion time on a single machine subject to non-renewable resource constraints, A tight approximation ratio of a list scheduling algorithm for a single-machine scheduling problem with a non-renewable resource, Optimal resource profiles for program scheduling, New complexity and approximability results for minimizing the total weighted completion time on a single machine subject to non-renewable resource constraints, EPTAS for load balancing problem on parallel machines with a non-renewable resource, Approximability of scheduling problems with resource consuming jobs



Cites Work