Algorithms for two-machine flow-shop sequencing with precedence constraints
From MaRDI portal
Publication:800822
DOI10.1016/0377-2217(84)90238-8zbMath0551.90041OpenAlexW2083877644MaRDI QIDQ800822
A. M. A. Hariri, Chris N. Potts
Publication date: 1984
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(84)90238-8
branch-and-bound algorithmLagrangean relaxationprecedence constraintstwo-machine flow-shoplower bounding ruleminimizing the maximum completion time
Numerical mathematical programming methods (65K05) Deterministic scheduling theory in operations research (90B35)
Related Items (3)
The two-machine flow shop problem with arbitrary precedence relations ⋮ A two-machine flowshop problem with processing time-dependent buffer constraints-an application in multimedia presentations ⋮ Cellular control of manufacturing systems
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- An adaptive branching rule for the permutation flow-shop problem
- Scheduling two job classes on a single machine
- A branch and bound algorithm for the two-stage assembly scheduling problem
- Sequencing n Jobs on Two Machines with Arbitrary Time Lags
- Optimal two- and three-stage production schedules with setup times included
- The Two-Machine Maximum Flow Time Problem with Series-Parallel Precedence Constraints: An Algorithm and Extensions
- Sequencing to Minimize the Maximum Job Cost
- The Two-Machine Maximum Flow Time Problem with Series Parallel Precedence Relations
- TWO-MACHINE SCHEDULING UNDER REQUIRED PRECEDENCE AMONG JOBS
- TWO-MACHINE SCHEDULING UNDER ARBITRARY PRECEDENCE CONSTRAINTS
- A General Bounding Scheme for the Permutation Flow-Shop Problem
This page was built for publication: Algorithms for two-machine flow-shop sequencing with precedence constraints