Achievement test construction using 0-1 linear programming
From MaRDI portal
Publication:807371
DOI10.1016/0377-2217(91)90195-2zbMath0729.90991OpenAlexW2054112279MaRDI QIDQ807371
Ellen Boekkooi-Timminga, Jos J. Adema, Wim J. van der Linden
Publication date: 1991
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(91)90195-2
Applications of mathematical programming (90C90) Linear programming (90C05) Boolean programming (90C09) Computational methods for problems pertaining to operations research and mathematical programming (90-08)
Related Items (5)
Application of robust optimization to automated test assembly ⋮ Decision support system for the composition of the examination problem ⋮ A mixed integer programming model for multiple stage adaptive testing ⋮ Determining targets for multi-stage adaptive tests using integer programming ⋮ A constraint programming approach to extract the maximum number of non-overlapping test forms
Cites Work
This page was built for publication: Achievement test construction using 0-1 linear programming