Flowshop/no-idle scheduling to minimize total elapsed time
From MaRDI portal
Publication:811886
DOI10.1007/S10898-004-1848-YzbMath1093.90018OpenAlexW2027090910MaRDI QIDQ811886
Publication date: 23 January 2006
Published in: Journal of Global Optimization (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10898-004-1848-y
Related Items (6)
A variable iterated greedy algorithm with differential evolution for the no-idle permutation flowshop scheduling problem ⋮ iGreen: green scheduling for peak demand minimization ⋮ No-idle parallel-machine scheduling of unit-time jobs with a small number of distinct release dates and deadlines ⋮ Metaheuristics with restart and learning mechanisms for the no-idle flowshop scheduling problem with makespan criterion ⋮ New heuristics for total tardiness minimization in a flexible flowshop ⋮ A discrete artificial bee colony algorithm for the no-idle permutation flowshop scheduling problem with the total tardiness criterion
Cites Work
- Optimal two- and three-stage production schedules with setup times included
- An improved branch and bound procedure forn ×m flow shop problems
- Special cases of the flow-shop problem
- Flowshop/no-idle or no-wait scheduling to minimize the sum of completion times
- A General Algorithm for Solution of the n-Job, M-Machine Sequencing Problem of the Flow Shop
- Development of M-Stage Decision Rule for Scheduling N Jobs Through M Machines
This page was built for publication: Flowshop/no-idle scheduling to minimize total elapsed time